Phase 1
Confined Structure Entry and Internal Works Setup
The project began inside the existing building, which meant all demolition activity had to be staged from within the structure itself. Machinery and crew were brought into the space through controlled access points, ensuring no impact on the surrounding retained walls.
Internal protection measures were installed to manage vibration, debris spread, and contact with the building envelope. This created a controlled demolition zone inside the structure, allowing the team to work safely without affecting the integrity of the external shell. This phase is essential in internal demolition because it establishes a safe working environment before any structural elements are disturbed.