Phase 4
Material Separation, Waste Removal and Site Clearing
As the structure came down, materials were sorted into dedicated waste streams. Brick, steel, timber, and concrete were separated on site to support responsible disposal and recycling. Melway’s integrated demolition and bin hire operations allowed for continuous load out without interrupting workflow.
This approach reduces environmental impact and keeps the site organised, which is essential in a high traffic location like Collingwood. Efficient waste handling also shortens overall project duration and improves safety by reducing clutter and trip hazards.