Phase 1
High Density Urban Setup and Public Interface Control
Working in Docklands means operating within a live environment where pedestrian movement, vehicle access, and surrounding assets must be protected at all times. The project began with detailed planning to establish safe work boundaries and manage public interaction with the site.
Temporary fencing, exclusion zones, and controlled entry points were installed to separate demolition activity from the surrounding precinct. This phase is essential in high density urban demolition because it ensures the public remains safe while allowing the demolition team to work without interruption. It also reduces the risk of debris migration and maintains clear communication with nearby businesses and residents.